Locations & incentives

Compare locations by time to operate, incentives and cost

Ecozones, freeports, IT parks and business districts: incentive rules, infrastructure, costs and permit times for each, in one place, so you can shortlist before you visit.

Ranked for your project

Pick an industry; every location is scored for the same foreign-owned project. Tick up to three to compare in detail.

LocationType Holiday, Tier I–IIICompare
Laguna Technopark PEZA ecozone · Biñan / Santa Rosa 84 124 16% 5 / 6 / 7 yrs
Clark Freeport Zone Freeport · Clark Development Corporation 89 132 18% 6 / 7 / 7 yrs
First Philippine Industrial Park PEZA ecozone · Santo Tomas, Batangas 91 135 21% 6 / 7 / 7 yrs
Subic Bay Freeport Freeport · Subic Bay Metropolitan Authority 92 136 22% 6 / 7 / 7 yrs
Mactan Economic Zone PEZA ecozone · Lapu-Lapu, Cebu 92 136 20% 5 / 6 / 7 yrs
PHIVIDEC Industrial Estate Industrial estate · Tagoloan and Villanueva, Misamis Oriental 99 147 24% 6 / 7 / 7 yrs
New Clark City, Tarlac BCDA city · industrial estates in the Clark special economic zone 102 151 31% 6 / 7 / 7 yrs
Zamboanga Freeport Ecozone and freeport · Zamboanga City Special Economic Zone Authority 105 — — 6 / 7 / 7 yrs

Modelled sample medians in working days, foreign-owned project; data as of 11 Oct 2026. Permits and utility connections only: building or fitting out the facility is not included. Ranges and late shares are hidden below 10 projects. Locations that do not fit the industry are left out. In the Bangsamoro region (BARMM), projects register with the region's own Board of Investments.

Side by side

Comparing 3 locations · holiday shown for Tier I

Attribute New Clark City, TarlacClark Freeport ZoneLaguna Technopark
Administered by BCDA · PEZA / CDCCDCPEZA
Location category All other areas (likely)All other areas (likely)Metro area / next to NCR (likely)
Holiday for your tier 6 years6 years5 years
Nearest international airport Clark Intl ≈ 30 minClark Intl, in zoneNAIA ≈ 60 min
Nearest seaport Subic Bay ≈ 60 minSubic Bay ≈ 50 minManila ≈ 75 min
Power Via park operatorClark Electric Distribution Corp.Meralco
Daily minimum wage ₱600 · Region III₱600 · Region III₱600 · Region IV-A
Space cost ~₱240 /sqm/mo ready-built factory~₱260 /sqm/mo factory · ~₱550 office~₱300 /sqm/mo ready-built factory
Office vacancy ———
Time-to-operate, sample 102 w.d. (80% within 151)89 w.d. (80% within 132)84 w.d. (80% within 124)
Sample project foreign-owned semiconductor plantforeign-owned semiconductor plantforeign-owned semiconductor plant
Steps released late 31%18%16%

Travel times are approximate. Wages: daily non-agricultural minimum under the latest regional wage orders (NCR-26 at ₱695 since 18 Jul 2025); confirm with the RTWPB. Office rents: Savills Q2 2026 averages; vacancy: CBRE Q2 2026. Figures marked ~ are demo estimates pending broker data.

Estimate your income-tax incentives

Under the CREATE MORE Act, the length depends on where you locate and how your activity is tiered in the Strategic Investment Priority Plan.

Market
Activity tier (SIPP)

Manufacturing and IT-BPM start in Tier I; R&D-intensive and advanced-technology activities can qualify for Tier III. Regional HQs and most financial firms are not in the SIPP and take no holiday.

Project size

Over ₱15 billion is approved by the Fiscal Incentives Review Board and gets 20 years after the holiday instead of 10.

Location category
Indicative package
Income tax holiday
6 years
All other areas, Tier I
Then, for 10 years
5% tax on gross income, or enhanced deductions
The 5% rate replaces national and local taxes
Or skip the holiday: take the 5% gross-income tax or enhanced deductions straight away for 16 years.
  • Duty-free import of capital equipment, raw materials and parts
  • VAT exemption on importation and VAT zero-rating on local purchases (export enterprises)
  • +2 years of holiday in areas recovering from conflict or disaster (CREATE rule; confirm under the CREATE MORE IRR)

Indicative only. Holiday years follow RA 12066 (CREATE MORE) as summarised in PwC Tax Alert 04, 2025; tiering follows the current SIPP. Confirm with BOI, PEZA or FIRB. What these terms mean

Offices, regional headquarters and financial firms

Not every investor needs an ecozone. Offices can sit in any business district; what changes is the regulator you file with. Sample times are for a foreign-owned firm in BGC or Makati.

Set-up Register with Foreign ownership Capital Sample time-to-operate
IT-BPM or shared-services center in a PEZA IT building SEC, then PEZA Up to 100% None for export enterprises; US$200,000 if mainly domestic 69 w.d.
Regional headquarters (RHQ): cost center, no local income BOI endorsement, then SEC licence 100% (branch of foreign parent) US$50,000 remitted a year 75 w.d.
Regional operating HQ (ROHQ): serves affiliates for fees BOI endorsement, then SEC licence 100% (branch of foreign parent) US$200,000 one-time remittance; regular corporate income tax since 2022 79 w.d.
Investment house SEC licence · BSP oversight Up to 100% (RA 10881) Set by SEC rules 141 w.d.
Fund manager / investment company adviser SEC licence (RA 2629) Confirm with SEC and the Negative List Set by SEC rules 134 w.d.
Foreign bank branch or subsidiary BSP Monetary Board approval Up to 100% (RA 10641) Set by BSP by bank category Case by case

Sources: RA 8756 (RHQ / ROHQ), RA 10881 (investment houses), RA 10641 (foreign banks), RA 2629 (investment companies), Foreign Investments Act. AO 45 (2026) lifted the moratorium on new PEZA IT parks and IT buildings in Metro Manila: locators get incentives, developers do not (Tribune).

Locations we monitor

Tick up to three to compare side by side.

New Clark City, Tarlac

BCDA city · industrial estates in the Clark special economic zone

A planned 9,450-hectare city in Capas and Bamban, with the 120-hectare Filinvest Innovation Park and a 100-hectare Science Park estate under a 50-year BCDA lease signed in January 2025.

Airport
Clark Intl ≈ 30 min
Seaport
Subic Bay ≈ 60 min
Factory space
~₱240 /sqm/mo ready-built factory
Holiday, Tier I–III
6 / 7 / 7 yrs
Light manufacturingLogisticsData centers
Sample time-to-operate 102 w.d.foreign-owned semiconductor plant Full profile →

Clark Freeport Zone

Freeport · Clark Development Corporation

An established freeport around Clark International Airport with aviation, logistics and electronics locators, plus IT-BPM offices in Clark Global City.

Airport
Clark Intl, in zone
Seaport
Subic Bay ≈ 50 min
Factory space
~₱260 /sqm/mo factory · ~₱550 office
Holiday, Tier I–III
6 / 7 / 7 yrs
ElectronicsAviationLogisticsIT-BPM
Sample time-to-operate 89 w.d.foreign-owned semiconductor plant Full profile →

Subic Bay Freeport

Freeport · Subic Bay Metropolitan Authority

A deep-water freeport on the former US naval base, with container terminals, ship repair and a duty-free trading base.

Airport
Clark Intl ≈ 50 min
Seaport
Subic Bay, in zone
Factory space
~₱230 /sqm/mo ready-built factory
Holiday, Tier I–III
6 / 7 / 7 yrs
Shipbuilding & repairLogisticsLight manufacturing
Sample time-to-operate 92 w.d.foreign-owned semiconductor plant Full profile →

Laguna Technopark

PEZA ecozone · Biñan / Santa Rosa

A long-established electronics and automotive cluster on the expressway south of Metro Manila.

Airport
NAIA ≈ 60 min
Seaport
Manila ≈ 75 min
Factory space
~₱300 /sqm/mo ready-built factory
Holiday, Tier I–III
5 / 6 / 7 yrs
SemiconductorsElectronicsAutomotive
Sample time-to-operate 84 w.d.foreign-owned semiconductor plant Full profile →

First Philippine Industrial Park

PEZA ecozone · Santo Tomas, Batangas

A large estate on the STAR Tollway with port access to the south, home to electronics and precision manufacturers.

Airport
NAIA ≈ 90 min
Seaport
Batangas ≈ 45 min
Factory space
~₱280 /sqm/mo ready-built factory
Holiday, Tier I–III
6 / 7 / 7 yrs
ElectronicsPrecision partsFood
Sample time-to-operate 91 w.d.foreign-owned semiconductor plant Full profile →

Mactan Economic Zone

PEZA ecozone · Lapu-Lapu, Cebu

A long-running export zone beside an international airport, with a deep electronics and semiconductor supplier base in the Visayas.

Airport
Mactan-Cebu Intl, adjacent
Seaport
Cebu ≈ 30 min
Factory space
~₱320 /sqm/mo ready-built factory
Holiday, Tier I–III
5 / 6 / 7 yrs
SemiconductorsElectronicsPrecision parts
Sample time-to-operate 92 w.d.foreign-owned semiconductor plant Full profile →

Bonifacio Global City

CBD · PEZA IT buildings · Taguig

Metro Manila's highest average office rent and lowest vacancy in Q2 2026; home to many regional headquarters, banks and global capability centers.

Airport
NAIA ≈ 30 min
Seaport
Manila ≈ 45 min
Office cost
₱1,094 /sqm/mo average office rent
Holiday, Tier I–III
4 / 5 / 6 yrs
Regional HQsBanking & financeIT-BPM
Sample time-to-operate — w.d.not a fit for semiconductors Full profile →

Makati CBD

CBD · PEZA IT buildings · Makati

The traditional financial district, with many bank head offices and the largest base of law and audit firms.

Airport
NAIA ≈ 25 min
Seaport
Manila ≈ 30 min
Office cost
₱992 /sqm/mo average office rent
Holiday, Tier I–III
4 / 5 / 6 yrs
Banking & financeProfessional servicesRegional HQs
Sample time-to-operate — w.d.not a fit for semiconductors Full profile →

Ortigas Center

CBD · PEZA IT buildings · Pasig

A lower-cost Metro Manila district with a large IT-BPM base and headquarters of several conglomerates and the Asian Development Bank.

Airport
NAIA ≈ 45 min
Seaport
Manila ≈ 45 min
Office cost
₱691 /sqm/mo average office rent
Holiday, Tier I–III
4 / 5 / 6 yrs
IT-BPMShared servicesCorporate HQs
Sample time-to-operate — w.d.not a fit for semiconductors Full profile →

Cebu IT Park

PEZA IT park · Cebu City

The Visayas' main IT-BPM district, 30 minutes from Mactan-Cebu airport, with a large English-speaking graduate pool.

Airport
Mactan-Cebu Intl ≈ 30 min
Seaport
Cebu ≈ 20 min
Office cost
~₱650 /sqm/mo office rent
Holiday, Tier I–III
5 / 6 / 7 yrs
IT-BPMShared servicesSoftware
Sample time-to-operate — w.d.not a fit for semiconductors Full profile →

Iloilo Business Park

PEZA IT park · Mandurriao, Iloilo City

A newer township on the former Iloilo airport site, drawing IT-BPM operators looking beyond Manila and Cebu.

Airport
Iloilo Intl ≈ 35 min
Seaport
Iloilo ≈ 15 min
Office cost
~₱550 /sqm/mo office rent
Holiday, Tier I–III
6 / 7 / 7 yrs
IT-BPMShared services
Sample time-to-operate — w.d.not a fit for semiconductors Full profile →

Davao City IT parks

PEZA IT parks · Matina IT Park, Damosa IT Park

Mindanao's largest city and main IT-BPM base. PEZA registered a new export data-processing centre at Matina IT Park in July 2026.

Airport
Francisco Bangoy Intl ≈ 20 min
Seaport
Davao (Sasa) ≈ 20 min
Office cost
~₱500 /sqm/mo office rent
Holiday, Tier I–III
5 / 6 / 7 yrs
IT-BPMShared services
Sample time-to-operate — w.d.not a fit for semiconductors Full profile →

PHIVIDEC Industrial Estate

Industrial estate · Tagoloan and Villanueva, Misamis Oriental

A 3,000-hectare estate run by the PHIVIDEC Industrial Authority, with the Mindanao Container Terminal inside it and 59 locators in 2025. 300 hectares are reserved for a future steel mill.

Airport
Laguindingan ≈ 75 min
Seaport
Mindanao Container Terminal, in estate
Factory space
~₱180 /sqm/mo ready-built factory
Holiday, Tier I–III
6 / 7 / 7 yrs
Heavy industryAgri-processingLogistics
Sample time-to-operate 99 w.d.foreign-owned semiconductor plant Full profile →

Zamboanga Freeport

Ecozone and freeport · Zamboanga City Special Economic Zone Authority

Created by Republic Act 7903 in 1995 and covering about 16,000 hectares on the city's west coast; locators include a shipyard and a fuel depot.

Airport
Zamboanga Intl ≈ 30 min
Seaport
Zamboanga ≈ 30 min
Factory space
~₱160 /sqm/mo factory
Holiday, Tier I–III
6 / 7 / 7 yrs
ShipbuildingFisheries processingLogistics
Sample time-to-operate 105 w.d.foreign-owned semiconductor plant Full profile →