Central Luzon · Region III

New Clark City, Tarlac

A 9,450-hectare planned city in Capas and Bamban, developed by the Bases Conversion and Development Authority inside the Clark special economic zone, with new industrial parks and direct links to Clark International Airport and the ports of Subic and Manila.

Administered by
BCDA · PEZA / CDC
Ecozone status
Clark special economic zone
Incentive location
All other areas (likely)
Nearest airport
Clark Intl ≈ 30 min
Time-to-operate (modelled)
102 working days

Fit for your industry

Strength
Room to build

Large flat parcels and new estates suit greenfield fabs and assembly-test plants.

Strength
Air freight

Clark International Airport is close for high-value, low-weight shipments.

Check
Supplier depth

The established electronics supplier base is in Laguna, Batangas and Cebu. Expect to truck most parts from there at first.

Incentives here

Inside a registered ecozone (PEZA or CDC), incentives under the CREATE MORE Act apply. Outside an ecozone, register with BOI instead. Figures follow RA 12066 as summarised by PwC.

IncentiveHereGranted by
Income tax holiday6–7 years (all other areas · Tier I–III, likely)PEZA / BOI
After the holiday10 years of 5% tax on gross income or enhanced deductions (20 years if over ₱15B and FIRB-approved)PEZA / BOI
Relocating from Metro Manila+3 years of holiday (CREATE rule; confirm under the CREATE MORE IRR)PEZA / BOI
Imports & VATDuty-free capital equipment and inputs; VAT zero-rating on local purchases for exportersPEZA / BOI · BOC
Local incentivesBusiness tax relief and fee waivers under the provincial and municipal investment codes; your case officer confirms what appliesProvince of Tarlac · Capas
Green LaneFast-track permitting if certified as a strategic investment (EO 18)BOI OSAC-SI
Estimate your package →

Industrial parks

Filinvest Innovation Park

Accepting locators
120 ha · Filinvest–BCDA joint venture

Phase 1 open to logistics, e-commerce, light manufacturing and data centers; ready-built factories offered.

Science Park, New Clark City

In development
100 ha · 50-year lease with BCDA

Lease signed 23 January 2025 with a ₱30 billion investment commitment from the operator and its locators.

Luisita Industrial Park

Operating
San Miguel, Tarlac City · 300 ha zone (Proc. 1207, 1998)

An established PEZA estate beside SCTEX; ask the operator for vacant lots and ready-built units.

TARI Estate

Phase 1 sold
Aboitiz InfraCapital · Tarlac City · 200 ha, expanding to 384 ha

Declared an ecozone under Proclamation 701. Phase 1 turnover targeted for Q3 2026; a 184 ha expansion with House of Investments was agreed in August 2025.

Infrastructure & logistics

Airport
Clark International
≈ 30 min
Seaport
Subic Bay
≈ 60 min via SCTEX
Seaport
Port of Manila
≈ 2 hrs
Expressways
SCTEX · TPLEX
North to Pangasinan, south to Manila
Power
Via park operator
Confirm substation capacity per park
Water & wastewater
Via park operator
Confirm capacity per park

Talent & operating costs

Population, Tarlac (2020 census)
1.50 M
Engineering & IT graduates / yr (Region III)
~17,000
Daily minimum wage (Region III)
₱600
Industrial power rate
~₱10.5/kWh
Industrial land lease
~₱35/sqm/mo
Ready-built factory
~₱240/sqm/mo

Universities within reach

  • Tarlac State University
  • Tarlac Agricultural University
  • Holy Angel University, Angeles
  • TESDA provincial training centers

Ask your case officer about TESDA training partnerships for production staff.

Permit performance here

Demo · illustrative sample · median working days, middle-80% range · ~ figures above are demo estimates

See an example case →
StepOfficeStandardMedianRange
Ecozone registrationPEZA / CDC202819–44
Locational & building permitsZone authority / LGU7126–26
Fire safety certificateBFP7106–22
Environmental Compliance CertificateDENR-EMB Region III203723–63
Power connectionPark utility—6338–104

Risk & resilience

Flooding

Run your parcel through HazardHunterPH for flood and landslide ratings.

Earthquake

Check distance to active faults in PHIVOLCS FaultFinder before you buy or lease.

Typhoon exposure

Central Luzon sits in the typhoon belt; ask the park for its design wind speed and drainage plan.

Power reliability

Ask the park operator for outage hours per year and backup supply.

Who to talk to

BCDA
Master developer, New Clark City
bcda.gov.ph
PEZA
Ecozone registration & incentives
peza.gov.ph
Province of Tarlac
Provincial investment promotion office
tarlac.gov.ph
EASE PH Red Carpet
One contact who coordinates all of the above
Request assistance →